Saturday 10 October

TodayWeek 10

Calendar unavailable. Google token refresh failed: { "error": "invalid_grant", "error_description": "Bad Request" }

Today

0 of 7 · 7h 25m left

Saturday is the last open block before the MEC4407 50% report run-in — spend most of it inside the team Drive doc and clear the minutes backlog on the way in.

Dropped the Overleaf draft of the ENG4702 paper again — it now sits in the 16 Oct → 19 Oct gap — and note the systematic review has firmed up to 23 Oct, the same day as three zero-if-missed peer evaluations.

Gym — Saturday session, full structured plan block from the 8-week Hevy plan

Saturday morning slot is already the plan; gym is the item that flexes last, not first.

Gym08:001h 30mHigh

Clear the MEC4407 minutes backlog — post the W10 meeting minutes into the team Drive doc and submit the 1% item

W10 minutes never got posted yesterday, and the W11 1% item due 14 Oct is queued behind them.

MEC440709:4540mHigh

MEC4407: build the detailed-design FEA results table in the team Drive doc — all three load cases, with a caption written under every image

This is yesterday's unticked item and the spine of the 50% detailed design report due Fri 16 Oct.

MEC440710:301h 30mCritical

Send the two chasing emails — Kelly (systematic review oral component + AT3 format) and Wordley (confirm final report is 16 Oct, not W12 Thursday)

Both answers reshape the next six days and Friday's deadline can't wait on a reply that was never sent.

Admin15m

MEC4407: draft the detailed-design discussion section into the team Drive doc — results against the recoil / dogboning / foreshortening targets and what each failure mode means for the design

Second MEC4407 block — 50% of a unit with no extensions, and Tuesday's single deep-work block cannot carry it alone.

MEC440713:001h 30mCritical

ENG4702: log the FYP lab numbers into the parametric table — recoil %, dogboning and foreshortening for M3-3 / M3-14 / M3-16 across CCS and OCS squares, flagging every off-target case

Carried from yesterday; the 19 Oct paper hurdle can't be drafted until this table is clean.

ENG470214:451hHigh

MMA2005: convert two more weeks of notes into the portfolio format and upload the chunk

Pass/fail hurdle with a date still unknown — cheapest insurance against the unit being capped at 45.

MMA200516:001hHigh

Schedule

Google Calendar

Nothing scheduled today.

New on Moodle

Nothing harvested yet. The morning run fills this in.

Coming up

next 4 weeks
4dMEC4407Weekly Team Meeting Minutes W11 (1%)
5dMEC4407W11 Team Meeting minutes (1%)
6dMEC4407Final / Detailed Design Submission (50%)
9dENG4702FINAL PAPER — hurdle
11dMEC4407Final Design Oral Presentation / Showcase (5%)
13dENG4702Presentation submission — hurdle
13dMEC4407ITP Metrics Peer Evaluation — not completing it zeroes the stage
13dBMS3052Research Translation Part B peer evaluation — not completing it scores 0