Friday
Last day of mid-sem break: get the ENG4702 hurdle paper drafted and standing while the calendar is still empty, and clear the unblocks that everything else is waiting on.
Dropped from today: the BMS3052 Part B campaign outline (fits Tue 29 Sep protected deep work) and the MEC4407 W9 minutes (belong in Wed 30 Sep team slot) — but note the Fri 2 Oct BMS PPD and Fuse1 print both land just before the 3-4 Oct festival, so they must be finished by Thu 1 Oct.
Send the three chase emails — Kelly (systematic review due date + oral component), Wordley (MEC4407 final report 16 Oct vs W12 Thu), MMA2005 coordinator (notes portfolio date and format) — and log whi
The systematic review due date is the highest-value unknown of the semester and it slipped yesterday; everything downstream is planned blind until these land.
Draft the ENG4702 Results & Discussion for M3-3 CCS square and rectangular — recoil, dogboning and foreshortening written against target with the numbers lifted straight from the ENG4701 progress repo
Today is the last day of break and break is the only slack long enough for this hurdle paper; drafting it now is what makes the W11-12 pile-up survivable.
Stand up the full paper skeleton in the ENG4702 template — paste the ENG4701 sections in, drop in the M3-3 figures and tables, and mark every remaining gap
Reframes the paper as an editing job so W10-11 only has to fill gaps instead of starting from nothing while the MEC4407 final report is running.
File the Test 2 post-mortem and populate every empty W1-W9 topic page in the live MMA2005 notes portfolio document
Pass/fail hurdle that caps the unit at 45, and the portfolio has to be current before W10 content starts landing on Monday — a lighter version of what slipped yesterday.
Bank one outstanding MEC4407 ANSYS discipline training set end-to-end and submit it in the same sitting
All five sets are already released, weekly activities carry no extensions, and the setup transfers straight from the Abaqus FYP work — cheapest 2% left on the board.
Complete today's 8-week gym plan session and log every set in Hevy
Break is the easiest week of the semester to hold the 8 hrs/week target, and this is the one commitment that is not the flex item.
Schedule
Nothing scheduled today.
New on Moodle
Nothing harvested yet. The morning run fills this in.