Sunday 20 September

Week 8Back to today

Calendar unavailable. Google token refresh failed: { "error": "invalid_grant", "error_description": "Bad Request" }

Sunday

0 of 7 · 8h left

A light, mechanical Sunday before the break: land the admin that shapes the 22–24 Sep paper window, keep the systematic-review drip, and clear the hurdle-adjacent items.

Dropped the ENG4702 working-doc assembly and the MEC4407 ANSYS bundles — both fit the empty break week (Mon 21–Fri 25), which is the only real capacity left before the 16 Oct wall; the one hard date inside that break is the W9 minutes, Wed 23 Sep. Google Calendar couldn't be read, so the times below follow your standing Sunday rhythm (gym 8–9:30, review 10–12, Airbnb 6–7, check-in 7pm).

Gym: full Sunday session per the existing 8-week plan, logged in Hevy

The 8-week plan is the one commitment explicitly not the flex item, and Sunday is its fixed slot.

Gym08:001h 30mHigh

BMS3052 systematic review: 2-hour drip block — advance the current section and log what moved

30% of a double unit with a still-unknown due date; the Sunday drip is the only thing stopping it becoming a W12 emergency.

BMS305210:002hHigh

Send the three chasing emails (Kelly: systematic review due date + oral component; Wordley: final report 16 Oct vs W12 Thu; MMA2005 coordinator: notes portfolio date and format)

Break week starts tomorrow — every answer has to land before the 22–24 Sep drafting window or that window gets planned blind.

Admin12:3030mCritical

MMA2005: write the Test 2 post-mortem as page 1 of the notes portfolio, then build the W1–W8 topic skeleton

The notes portfolio is a pass/fail hurdle that caps the unit at 45, and this slipped yesterday — Test 2 was only Thursday, so the post-mortem is still accurate.

MMA200513:302hCritical

MEC4407: pin the W9 break-week team meeting time and post the agenda in the Team Drive minutes doc

W9 minutes are due Wed 23 Sep and the team scatters during break week — the meeting has to be locked today or the 1% dies quietly.

MEC440715:4530mHigh

Airbnb: clear the week's messages, adjust pricing, reply to reviews

Boxed to the Sunday 6–7pm slot — it only stays out of study hours if it stays here.

Airbnb18:001h

Plan the break into the calendar: allocate Mon 21–Fri 25 to the ENG4702 paper draft (22–24) and the outstanding ANSYS training sets

The break is the only capacity left to draft the FYP paper clear the ANSYS backlog before the 16 Oct wall, and it starts tomorrow, not later.

Admin19:0030mHigh

Schedule

Google Calendar

Nothing scheduled today.

New on Moodle

Nothing harvested yet. The morning run fills this in.

Coming up

next 4 weeks
3dMEC4407Weekly Team Meeting Minutes W9 (1%) — in break week
11dMEC4407W9 Team Meeting minutes (1%)
12dMEC4407Fuse1 Nylon 12 Printing Submission 2 (1%)
12dBMS3052Personal & Professional Development (2%)
17dBMS3052Research Translation Part B (9%)
17dMEC4407Weekly Team Meeting Minutes W10 (1%)
18dMEC4407W10 Team Meeting minutes (1%)
24dMEC4407Weekly Team Meeting Minutes W11 (1%)