Monday
First day of the break: bank one ANSYS set, clear the slipped admin, and build the ENG4702 paper skeleton so Tue–Thu are pure drafting.
Dropped personal projects and four of the five ANSYS sets — today banks one plus the paper skeleton. Also the deadline feed double-lists W9 minutes (23 Sep AND 1 Oct) and W10 (7 AND 8 Oct); confirm which is the real submission when you pin the meeting.
Send the three chase emails and file the replies: Kelly (systematic review due date + oral component), Wordley (final report 16 Oct vs W12 Thu), MMA2005 coordinator (notes portfolio date and format)
Slipped yesterday, and the systematic review still has no due date — every Sunday block to 23 Oct is being planned blind until Kelly answers.
Pin the W9 break-week team meeting time in the Team Drive and post the agenda before anyone disappears for the break
The W9 minutes are due Wed 23 Sep inside break week, so the meeting has to happen before then — it needs to go out this morning.
Build the ENG4702 final paper skeleton from the ENG4701 progress report: stub every section, paste the reusable text, list the holes — and block Tue–Thu 4-hour drafting slots in the calendar
The break window is the single decision that makes W11–12 survivable; tomorrow's blocks can only be writing if the skeleton exists today.
Systematic review: run the 90-minute drip block on the current section and log exactly what moved in the tracking doc
Sunday's drip was skipped and this is the item most likely to eat the semester — and its due date is still unknown, so it cannot be deferred.
Gym: Monday session per the existing 8-week plan, every set logged in Hevy
Sunday's session was missed; gym is not the flex item and break week is where it gets protected, not traded away.
Write the Test 2 post-mortem as page 1 of the MMA2005 notes portfolio, then lay in the W1–W8 topic skeleton
Pass/fail hurdle with a date still TBA — failing it caps the unit at 45 and removes supplementary assessment, so it starts today, not after the break.
Bank one outstanding ANSYS discipline set end-to-end and submit it
All five sets are already released and transfer from the Abaqus FYP work — this is free break-week capacity that vanishes once W10 starts.
Airbnb: clear the week's CBD messages, adjust pricing, reply to open reviews — then close the tab
Sunday's 1-hour box was skipped; keep it to 45 minutes today so it does not bleed into the drafting days.
Schedule
Nothing scheduled today.
New on Moodle
Nothing harvested yet. The morning run fills this in.