Monday 28 September

Week 9Back to today

Calendar unavailable. Google token refresh failed: { "error": "invalid_grant", "error_description": "Bad Request" }

Monday

0 of 5 · 5h 45m left

Reset day: clear the slipped admin and the MMA2005 hurdle before the 9am workshop, then bank MEC4407 progress and the missed systematic-review drip after campus.

Calendar failed to load, so these times assume the standard Monday (workshop 9-10, tutorial 12-2, gym 2:30-4) — check nothing else landed. I dropped the Airbnb box to next Sunday; the mid-semester ENG4702 draft never happened, so start the paper skeleton tomorrow or the W11/12 wall stays unmitigated.

Admin: send the three chase emails (Kelly — systematic review due date + oral component; Wordley — final report 16 Oct vs W12 Thu; MMA2005 coordinator — notes portfolio date and format) and file any r

Slipped from yesterday and it is still the highest-value unknown of the semester — the systematic review date changes the whole back half of the plan.

Admin07:0020mHigh

MMA2005: audit the W1-W9 topic pages against the practical worksheets and write every missing portfolio page, finishing with a written list of what still remains

Pass/fail hurdle with a TBA date in the second half of semester — it can land any week now and failing it caps the unit at 45, so it outranks ordinary study.

MMA200507:201h 40mCritical

MEC4407: push the detailed-design section of the Team Drive doc to a readable draft — geometry, component list and material selection written through, with today's revision history showing

This is the backbone of the 50% final report due 16 Oct, with no extensions or special consideration, and it must exist in the Drive doc to count as your contribution.

MEC440717:301h 30mHigh

MEC4407: complete and submit one outstanding ANSYS discipline-training set end-to-end in the one sitting, then list which of the five sets are still open

Five sets are already released and worth 2% each; every one banked now is 2% that cannot be lost later, and it transfers straight from the FYP Abaqus work.

MEC440719:301h 15mHigh

BMS3052: run the missed systematic-review drip — 60 minutes of screening and extraction logged in the review spreadsheet

Yesterday's Sunday dose did not happen and this is the item most likely to eat the semester; it only works as a drip, so it gets absorbed today rather than doubled up later.

BMS305220:451hHigh

Schedule

Google Calendar

Nothing scheduled today.

New on Moodle

Nothing harvested yet. The morning run fills this in.

Coming up

next 4 weeks
3dMEC4407W9 Team Meeting minutes (1%)
4dMEC4407Fuse1 Nylon 12 Printing Submission 2 (1%)
4dBMS3052Personal & Professional Development (2%)
9dBMS3052Research Translation Part B (9%)
9dMEC4407Weekly Team Meeting Minutes W10 (1%)
10dMEC4407W10 Team Meeting minutes (1%)
16dMEC4407Weekly Team Meeting Minutes W11 (1%)
17dMEC4407W11 Team Meeting minutes (1%)